FAQ

Will residents and businesses be notified prior to construction?

Yes. The Contractor is required to distribute a notice to all residents and businesses that will be affected within 150 feet of construction no less than seven (7)days prior to construction. 

Additionally,if there is a water service interruption, the property owner will be noticed hours prior to a service interruption, a notice shall be posted on the door (or handed to business/tenant/property owner) of each building with anticipated date/time range.

If access beyond the inside foyer door is not possible, notice shall be posted in the foyer.

Inspection Staff and the Contractor shall speak to the affected building (owner/tenant,business) before work begins or when someone is available to speak with; time of the interruption and reinstatement of the service shall be provided.

← Back to Knowledge Base