Opportunities

BID – 22 – 05 - COVE PARK WATERFRONT IMPROVEMENT (16TH BULKHEAD)

BID – 22 – 05
|
BID

Description

CITY OF HOBOKEN ADDENDUM TO BID DOCUMENTS

BID – 22 – 05 - COVE PARK WATERFRONT IMPROVEMENT (16TH BULKHEAD)

This Addendum # 4 dated November 17, 2022, is issued to modify the above-mentioned BID, and is hereby made part of the BID documents.  Please attach this Addendum #4 to the original documents in your possession and ensure same is included in your proposal.   This addendum includes:

*Missing mandatory form 1.   Missing   form:   “Statement   of   Acknowledgement   of   American   Iron   and   Steel Requirements”  on  the  bidder  check  list  (#26).  Please  include  the  form  when submitting your bid.

***NEW BID OPENING DATE: DECEMBER 9, 2022 AT 1:30PM PREVAILING TIME***

ATTEST:                                                                               Date:

November 17, 2022

Jennifer Mastropietro,

QPA Purchasing Agent

CITY OF HOBOKEN

ACKNOWLEDGMENT OF RECEIPT OF ADDENDA

BID – 22 – 05

COVE PARK WATERFRONT IMPROVEMENT (16TH BULKHEAD)

The undersigned Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number                       Date                                    Acknowledge Receipt

(Initial)

Addendum # 1               October 27, 2022                                            

Addendum # 2               October 31, 2022                                            

Addendum # 3               November 9, 2022                                          

Addendum # 4               November 17, 2022                                        

No addenda were received:

Acknowledged for:                                                                                  

 

(Name of Bidder)

By:                                                                    Date:                        

                              (Signature of Authorized Representative)

Name:                                                               Title/Position:                

                        (Print or Type)

2

3

STATEMENT OF ACKNOWLEDGEMENT

OF IMPLEMENTATION OF THE AMERICAN IRON AND STEEL PROVISIONS OF

P.L. 113-76, CONSOLIDATED APPROPRIATIONS ACT, 2014

The Contractor acknowledges to and for the benefit of the _                   (“Purchaser”) and the

                       _ (the “State”) that it understands the goods and services under this

Agreement are being funded with monies made available by the Clean Water State Revolving Fund

and/or Drinking Water State Revolving Fund and such law contains provisions commonly known as

“American Iron and Steel;” (P.L. 113-76, Consolidated Appropriations Act, 2014 (Act), section 436)

that requires all of the iron and steel products used in the project to be produced in the United

States (“American Iron and Steel Requirement”) including iron and steel products provided by the

Contactor pursuant to this Agreement. The Contractor hereby represents and warrants to and for the

benefit of the Purchaser and the State that

(a) the Contractor has reviewed and understands the American Iron and Steel Requirement, (b) all of

the iron and steel products used in the project will be and/or have been produced in the United

States in a manner that complies with the American Iron and Steel Requirement, unless a waiver of

the requirement is approved, and (c) the Contractor will provide any further verified information,

certification or assurance of compliance with this paragraph, or information necessary to support a

waiver of the American Iron and Steel Requirement, as may be requested by the Purchaser or the

State. Notwithstanding any other provision of this Agreement, any failure to comply with this

paragraph by the Contractor shall permit the Purchaser or State to recover as damages against the

Contractor any loss, expense, or cost (including without limitation attorney’s fees) incurred by

the Purchaser or State resulting from any such failure (including without limitation any impairment

or loss of funding, whether in whole or in part, from the State or any damages owed to the State by

the Purchaser). While the Contractor has no direct contractual privity with the State, as a lender

to the Purchaser for the funding of its project, the Purchaser and the Contractor agree that the

State is a third-party beneficiary and neither this paragraph (nor any other provision of this

Agreement necessary to give this paragraph force or effect) shall be amended or waived without the

prior written consent of the State. The following specific bid items and/or project components are

subject to the American Iron and Steel requirements:

Lined or unlined pipes or fittings; Manhole Covers; Municipal Castings; Hydrants; Tanks; Flanges;

Pipe clamps and restraints; Valves; Structural steel (Structural steel is rolled flanged shapes,

having at least one dimension of their cross-section three inches or greater); Reinforced precast

concrete; and Construction materials (Construction materials are those articles, materials, or

supplies made primarily of iron and steel, that are permanently incorporated into the project, not

including mechanical and/or electrical components, equipment and systems).

Municipal Castings:

Access Hatches; Ballast Screen; Benches (Iron or Steel); Bollards; Cast Bases; Cast Iron Hinged

Hatches, Square and Rectangular Cast Iron Riser Rings; Catch Basin Inlet; Cleanout/Monument Boxes;

Construction Covers and Frames; Curb and Corner Guards; Curb Openings; Detectable Warning Plates;

Downspout Shoes (Boot, Inlet); Drainage Grates, Frames and Curb Inlets; Inlets; Junction Boxes;

Lampposts; Manhole Covers, Rings and Frames, Risers; Meter Boxes; Service Boxes; Steel Hinged

Hatches, Square and Rectangular; Steel Riser Rings; Trash receptacles; Tree Grates; Tree Guards;

Trench Grates; and Valve Boxes, Covers and Risers.

Signature                                                                                          

          Date

Name and Title of Signer (Please Type)

← Back to Jobs, RFPs and RFQs Page